Byucksan Engineering Oil & Gas

Oil Business

Ulsan LNG-OIL Terminal Project Comprehensive EPC Design Service
Location : Ulsan, Korea
Client : SK Ecoengineering Co., Ltd.
Period : 2020.08 ~ Ongoing
Scope : 3 LNG storage tanks (Total 645,000㎥), 12 OIL storage tanks (Total 270,000㎥)
Yeosu Oil Tank Terminal Project
Location : Yeosu-si, Jeollanam-do
Client : Oilhub Korea Yeosu Co., Ltd.
Period : 2011.02. ~ 2013.03
Scope : Storage tanks (Total 8.2 million BBL), Al. Dome Roof Type
Kumho Petrochemical SBR 15th Expansion Construction
Location : Ulsan
Client : Kumho Petrochemical Co., Ltd.
Period : 2011.09. ~ 2012.11
Scope : SBR Production Capacity (80,000 MTPA)
Geoje Strategic Petroleum Reserve 1st, 2nd, 3rd Basic & Detailed Design and Construction Supervision Service
Location : Gyeongsangnam-do
Client : Korea National Oil Corporation (KNOC)
Period : 1980 ~ 2006
Scope : Reserve base (Total 5 - 27 million BBL) storage caverns (1.5km - 9.1km)
Incheon International Airport Phase 1, 2, 3 Plant Facility Construction Comprehensive Supervision Service
Location : Incheon International Airport
Client : Incheon International Airport Corporation
Period : 1998 ~ 2017
Scope : Storage tanks (Total 400,000 - 800,000 BBL), Pipelines (6″-24″ × 19-25.3km)
Total 19
발주처
국군재정관리단
사업명
21-공-유류탱크 철거 신축공사(4059)
수행년도
2021.06. ~ 수행 중
발주처
한국석유공사
사업명
동해가스전 원상복구 기본 및 실시설계용역
수행년도
2021.05. ~ 2022.03
발주처
한국석유공사
사업명
거제 2단계 수리시스템 설계용역
수행년도
2021.02. ~ 2021.12
발주처
에스케이에코엔지니어링(주)
사업명
울산 LNG-OIL Terminal Project EPC 종합설계용역
수행년도
2020.08. ~ 수행 중
발주처
한국공항공사
사업명
청주공항 항공유저장소 신축사업 건설사업관리용역
수행년도
2019.07. ~ 2021.01.
발주처
한국공항공사
사업명
김해공항 구 항공유저장소 철거 설계용역
수행년도
2019.07. ~ 2019.12
발주처
코리아에너지터미널(주)
사업명
울산북항 액화가스 및 석유제품 터미널 FEED용역
수행년도
2019.02. ~ 2020.05.
발주처
HDEC-HSHI JV
사업명
Detail Design for LPG Cavern and Loading/Unloading Facilitie…
수행년도
2019.01. ~ 2021.09
발주처
국군재정관리단
사업명
16-공-00부대 유류탱크 시설공사
수행년도
2016.05 ~ 2017.11
발주처
한국석유공사
사업명
울산비축기지 지하화 건설공사 건설사업관리용역
수행년도
2016.01. ~ 2021.07
Top