Major Achievements |
|
|
|
|
| |
| |
 |
|
The
company that is putting ceaseless effort to lay more advanced
foundation for human being is Byucksan Engineering |
|
|
|
 |
|
|
| |
| |
 |
|
|
| |
|
|
|
| |
|
Sewage,
Waste Water andRainwater |
|
|
| |
|
|
 |
Extension
of Seongnam Sewage Treatment Plant Stage 2 |
| |
|
Scope: Basic plan, enforcement design
and Total Responsibility Supervision |
 |
Scale: Sewage treatment capacity of 40,000m3/day
(Collection Pipe: L=6.1km, enforcement design) |
 |
Capacity |
| |
Existing Facility: 395,000m3
Extended Facility: 40,000m3 |
 |
Treatment Method: Biological
process for nitrogen and phosphorus (A2/O
technique) |
 |
Sewage Intercepting Pipe:
Dual-walled PE pipe with D=900mm and L=6.082.9m |
| |
|
|
|
|
 |
Extension
of Sewage Treatment Facility in Jecheon |
| |
|
Scope: Basic/ enforcement design, Total
Responsibility Supervision |
 |
Sewage Treatment Plant
Facility Capacity: 70,000m3/day
Sewage Treatment Method: Conventional activated
sludge process |
 |
Sewage Intercepting Pipe
Hasocheon Line (Size: D=400-500mm, Length:
3,232m (total of 4,363m))
Jangpyeongcheon Line (Size: D=450-600mm,
Length: 4,789m)
Wangam Industrial Complex Line (Size: D=450-600mm,
Length: 4,789m)
Night Soil Sending Line (Size: D=STS D200,
Length: 4,213m)
|
| |
|
|
|
|
 |
Construction Project of Yakmok Sewage
Treatment Plant |
| |
|
Scope: Basic/ enforcement design, Total
Responsibility Supervision |
 |
Sewage Treatment Plant
Facility Capacity: 20,000m3/day
Sewage Treatment Method: Activated sludge
process (A2/0 technique) |
 |
Sewage Intercepting Pipe
Line A (Size: D=400-1,100mm, Length: 3,18km)
Line B (Size: D=400-700mm, Length: 2.02km)
Line B-1 (Size: D=400mm, Length: 0.68km)
Line C (Size: D=300-600mm, Length: 1.92km)
Line D (Size: D=300-500mm, Length: 0.70km)
Line E (Size: D=400-600mm, Length: 0.69km)
|
| |
|
|
|
|
 |
Sewage Treatment Facility in Hyeon-ri,
Gapyeong-gun |
| |
|
Scope : Basic plan |
 |
Scale
Sewage Treatment Plant: 5,100m3/day, Arterial
Drainage Pipe: 10.33km |
 |
2 pumping stations |
 |
Treatment Method
Water Treatment: K-intermittent decanted
extended aeration process (KIDEA)
Sludge Treatment: Mechanical condensation
+ dehydration -> composting |
| |
|
|
|
|
 |
Seongnam Sewage Treatment Plant, Advanced
treatment & 3rd Extension |
| |
|
Customer : Seongnam-Si |
 |
Schedule : Apr,2003 ~ Dec,2004 |
 |
overview
Advanced Treatment Capacity : 220,000m3/day
Extension Capacity : 25,000m3/day
Advanced Treatment : A2O(NPR) Process |
 |
Scope :
Basic Design
Detailed Design |
| |
|
|
|
|
 |
Jeollabuk-Do Sewage Treatment Plant
|
| |
|
Customer : Jeollabuk-Do |
 |
Schedule : Oct,2000 ~ Aug,2004 |
 |
Overview :
Saemangeum Reclaimed Area (Saemangeum Tideland
Reclamation)
19 New Sewage Treatment Plant & Expansion
O & M of Existing Plants & New Plants
|
 |
Scope :
Master Plan
Basic Design
Detailed Design |
| |
|
|
| |
|
|
|
|
|