The company that is putting ceaseless effort to lay more advanced foundation for human being is Byucksan Engineering

 
 
   
 
Crude Oil and Gas Supply
Energy and power plant
Electric Power Facility
Industrial Facility
 
 
 
   

   
Crude Oil and Gas Supply
 
 
Geoje Crude Oil Transshipment Station
 
Scope : Research, design and supervision
Scale: Station 1 - 27,000,000bbl
             Station 2 - 12,000,000bbl
             Station 3 - 7,500,000bbl (including 4 ground tanks)
Details of Project
  1) Oil Type for Storage: Crude petroleum
2) Storage Method: Fixed water-level type underground cave at normal temperature
3) Storage Cave: Non-supporting underground rock-based cave
4) Crude oil supply facility and auxiliary facilities
   
Nationwide Oil Pipeline and Oil Reservoir in Metropolitan Region
 
Scope : Feasibility Study, design and supervision
Scale: 2,000,000bbl
Details of Project
  1) Target Oil Type: UG. DSL. KERO. JET A-1
2) Oil Pipeline: 800km (10Ħħ ~ 24Ħħ)
3) Tank: 39 units
   
Donghae-1 Gas Production Facility
 
Scope : Construction supervision
Gas Production Vol.: 50 MMscfd
Gas Production Facility
  Submarine facility, marine jacket, marine production facility, sea-borne and inland piping, inland production facility
   
Main Pipeline for Natural Gas Supply in Gangwon-Do Region (zone 1)
 
Scope : Design, supervision, supply of main materials
Scale: Main piping of 30Ħħ X 75 km
Supply control office (G/S: 2), (V/S: 2), (B/V: 2)
Details of Project
Natural gas supply piping from Suwon Supply Control Office to Gangwon-Do (Munmak)
   
Movable Natural Gas Charging Station
 
Scope : Design, purchase and installation
Scale: 61 stations targeted to nationwide bus companies
Details of Project
  1) Purpose of Installation: To install high pressure gas charging station by using movable charging
     vehicle and charging facilities, etc. and to improve air quality with the operation of CNG bus
2) Facility Status: Gas charging unit, movable charging vehicle, fire wall
   
Incheon International Airport Aircraft Refueling Facility
 
Customer: Incheon International Airport Fuel Facilities Corp.
Schedule: Mar. 1998 ~ Dec. 2000
Overview
  Fluid: Aviation turbine fuel
Capacity: 800,000 BBL
Loading: 227m3/H x 8 sets
Scope: Construction supervision and start-up operation
   
Ulsan Gas Field & Gathering Station
 
Customer: Korea National Oil Corp.
Schedule: Sep. 2001 ~ Jul. 2004
Overview
  Marine Pipe: 14", 61km
Capacity: 50MMscfd
NG Pipe: 14", 7.2km
Scope: Construction supervision and start-up operation
   
Southern Area Natural Gas Supply Pipeline
 
Customer: Korea Gas Corp.
Schedule: Jul. 1992 ~ Dec. 2000
Overview
  Length: 302km Size: 30"
Valve Station: 9 stations
Governor Station: 6 stations
Scope: Precision engineering and construction supervision