Geoje Crude
Oil Transshipment Station |
| |
|
Scope : Research, design and supervision |
 |
Scale: Station 1 - 27,000,000bbl Station
2 - 12,000,000bbl Station
3 - 7,500,000bbl (including 4 ground tanks) |
 |
Details of Project |
| |
1) Oil Type for Storage: Crude
petroleum
2) Storage Method: Fixed water-level type
underground cave at normal temperature
3) Storage Cave: Non-supporting underground
rock-based cave
4) Crude oil supply facility and auxiliary
facilities |
| |
|
|
|
|
 |
Nationwide
Oil Pipeline and Oil Reservoir in Metropolitan
Region |
| |
|
Scope : Feasibility Study, design and
supervision |
 |
Scale: 2,000,000bbl |
 |
Details of Project |
| |
1) Target Oil Type: UG. DSL.
KERO. JET A-1
2) Oil Pipeline: 800km (10Ħħ ~ 24Ħħ)
3) Tank: 39 units |
| |
|
|
|
|
 |
Donghae-1 Gas Production Facility |
| |
|
Scope : Construction supervision |
 |
Gas Production Vol.: 50 MMscfd |
 |
Gas Production Facility |
| |
Submarine facility, marine
jacket, marine production facility, sea-borne
and inland piping, inland production facility |
| |
|
|
|
|
 |
Main Pipeline for Natural Gas Supply
in Gangwon-Do Region (zone 1) |
| |
|
Scope : Design, supervision, supply of
main materials |
 |
Scale: Main piping of 30Ħħ X 75 km
Supply control office (G/S: 2), (V/S: 2),
(B/V: 2) |
 |
Details of Project
Natural gas supply piping from Suwon Supply
Control Office to Gangwon-Do (Munmak) |
| |
|
|
|
|
 |
Movable Natural Gas Charging Station
|
| |
|
Scope : Design, purchase and installation |
 |
Scale: 61 stations targeted to nationwide
bus companies |
 |
Details of Project |
| |
1) Purpose of Installation:
To install high pressure gas charging station
by using movable charging
vehicle and charging facilities, etc. and
to improve air quality with the operation
of CNG bus
2) Facility Status: Gas charging unit, movable
charging vehicle, fire wall
|
| |
|
|
|
|
 |
Incheon International Airport Aircraft
Refueling Facility |
| |
|
Customer: Incheon International Airport
Fuel Facilities Corp. |
 |
Schedule: Mar. 1998 ~ Dec. 2000 |
 |
Overview |
| |
Fluid: Aviation turbine fuel
Capacity: 800,000 BBL |
 |
Loading: 227m3/H x 8 sets
|
 |
Scope: Construction supervision
and start-up operation |
| |
|
|
|
|
 |
Ulsan Gas Field & Gathering Station
|
| |
|
Customer: Korea National Oil Corp. |
 |
Schedule: Sep. 2001 ~ Jul. 2004 |
 |
Overview |
| |
Marine Pipe: 14", 61km
Capacity: 50MMscfd
NG Pipe: 14", 7.2km |
 |
Scope: Construction supervision
and start-up operation |
| |
|
|
|
|
 |
Southern Area Natural Gas Supply Pipeline
|
| |
|
Customer: Korea Gas Corp. |
 |
Schedule: Jul. 1992 ~ Dec. 2000 |
 |
Overview |
| |
Length: 302km Size: 30"
|
 |
Valve Station: 9 stations
|
 |
Governor Station: 6 stations
|
 |
Scope: Precision engineering
and construction supervision |
| |
|
|
| |
|