U-2 Crude
Oil Transshipment Station |
| |
 |
Research and design |
| |
 |
Details of Project |
|
1) Investigation on the prearranged
site of underground cave for crude
oil storage facility |
|
2) Ground plan design in connection
with the existing facilities |
|
| |
|
|
|
|
 |
Sin-Uljin
Branch of Nuclear Power Plant |
| |
 |
Scope : Preliminary research |
| |
 |
Details of Project |
|
1) Site arrangement and scope
of the prearranged site designation
for nuclear power plant |
|
2) To be utilized as design
data in future construction projects |
|
| |
|
|
|
|
 |
Sin-Wolseong (Bonggil) Branch of Nuclear
Power Plant |
| |
 |
Scope : Detailed geological research |
| |
 |
Details of Project |
|
1) Examining possibility of
succeeding unit construction through
expansion of the site adjacent
to the
nuclear power plant |
|
2) Preparing data to obtain
permit from government offices,
such as site investigation report,
etc.
required in promotion of construction
operations |
|
| |
|
|
|
|
 |
Yeonggwang Nuclear Power Plant Unit
5 & 6 |
| |
 |
Scope : Additional geological research |
| |
 |
Details of Project |
|
1) Examining possibility of
succeeding unit construction through
expansion of the site adjacent
to the
nuclear power plant |
|
2) Preparing site research report
required in promotion of construction
operations |
|
| |
|
|
|
|
 |
Depth Drainage Way Design for Sin-Wolseong
Unit 1 & 2 |
| |
 |
Scope : Preliminary geological research |
| |
 |
Details of Project |
|
1) Geological research in the
prearranged zone for depth drainage
structure construction |
|
2) Selecting route by considering
various geological conditions
and engineering characteristics
of the
structure |
|
| |
|
|
|
|
 |
Foundation Reinforcement Construction
in Mungyeong Region |
| |
 |
Basic and enforcement design |
| |
 |
Details of Project |
|
1) Foundation stability assessment
through mineral extraction |
|
2) Determining the necessity
of precision research by administering
great-sphere research and
detailed
research |
|
| |
|
|
|
|
 |
Construction Project of Deep Water Intake
and Drainage Structure for Sin-Gori Unit 1 &
2 |
| |
 |
Scope: Supervision |
 |
Schedule: Oct. 2005 ~ Aug. 2008 |
 |
Customer: Korea Hydro & Nuclear
Power |
 |
Overview: Construction of cooling water
drainage tunnel for nuclear plant unit
1 & 2
Tunnel Length per Unit: 500m
|
| |
|
|
|
|
 |
Environmental Restoration Project for
Construction Site of I-Park in Dalcheon, Ulsan
|
| |
 |
Scope: Construction |
 |
Schedule: Jul. 2005 ~ Dec. 2006 |
 |
Customer: Hyundai Development Company
|
 |
Overview: Environmental restoration
for the polluted soil
|
| |
|
|
|
|
 |
Ground Stability Investigation in Buk-myeon
District of Jeongseon |
| |
 |
Scope: Precision research |
 |
Schedule: Feb. 2006 ~ Sep. 2006 |
 |
Customer: Coal Industry Promotion Board
|
 |
Overview: Research on ground settlement
caused by mining in dead pit as a part
of mine pollution control project |
| |
|
|
| |
|