Gyeongbu Express
Railway (KTX: Korea Train Express) Zone 5 |
| |
|
Scope : Detailed design |
 |
Overview : Length (5-2): 2,278m/ Width
(5-2): 14.0m |
 |
Super structure (5-2)
Type - P.S.C box Girder/ M.S.S
Main Span - 40m |
 |
Sub structure (5-2)
Pier - Hollow, concrete
Foundation - Steel pile
|
| |
|
|
|
|
 |
Gyeongbu Express
Railway (KTX) Zone 6-1 |
| |
|
Scope : Total Responsibility Supervision |
 |
Location: Sangseo, Daejeon-si ~ Sindae,
Daejeon-Si |
 |
Length: 2,890m/ Width: 14.0m |
 |
Super structure
Type - P.S.C box Girder/ F.C.M, F.S.M
Main Span - 90m/ F.C.M
|
 |
Sub structure
Pier - Circle, hollow, concrete
Foundation - Spread footing, steel pile,
Well foundation
|
| |
|
|
|
|
 |
Gyeongbu Express Railway (KTX) Zone
2-2 and 3 |
| |
|
Scope : Supervision |
 |
Length: 5,170m/ Width: 14.0m |
 |
Super structure
Type - P.S.C box Girder/ P.S.M, F.S.M, M.S.S
Main Span - 40m
|
 |
Super structure
Type - P.S.C box Girder/ F.C.M, F.S.M
Main Span - 90m/ F.C.M
|
| |
|
|
|
|
 |
Taiwanese Express Rail C280 Construction
Project (Design Service) |
| |
 |
Schedule: Mar. 2000 ~ May 2004 |
 |
Overview |
| |
 |
Design Speed: 350Km/hr |
 |
Length: 34.4Km (Width: 13.0m) |
 |
Type: FSLM(Full Span Launching Method)
|
 |
Bridge: 4-column system, cylinder
shape |
 |
Foundation: Bored pile (Diameter:
1.8~2.0m) |
 |
Earthquake Proof Strength: Seismic
acceleration of 0.4g applied |
|
 |
Detailed Design |
 |
Location: Chiayi Taipo - Hsinying
Tainan |
 |
Length: 17,700m / Width: 13.0m
|
 |
Super Structure
Type - P.S.C Box Girder (F.S.L.M)/ F.C.M
Main Span - 30-70m |
 |
Sub Structure
Pier - Circle width solid column
Foundation - Bored pile (Diameter: 1800-2000)
|
| |
|
|
|
|
 |
Seoul Subway Zone 7-21 Turnkey Design
Project |
| |
 |
Schedule: Jan. 1993 ~ Sep. 1999 |
 |
Overview |
| |
 |
Length: 2,784Km |
 |
Station: 2 (330m |
 |
Tunnel: 2.5Km |
 |
Ventilation Opening: 6 |
 |
Collecting Well: 3 |
|
| |
|
|
|
|
 |
Seoul Subway Line 9 & 12 Basic Design
Project |
| |
 |
Schedule: Nov. 1995 ~ Dec. 2001 |
 |
Overview |
| |
 |
Length: 40Km |
 |
Station: 36 |
 |
Tunnel: 9Km (Cut and Cover Tunnel:
31km) |
 |
SE: Cooperation with DE-C of Germany
|
 |
PM: Cooperation with DMJM of US
|
|
| |
|
|
|
|
 |
Seoul Subway Line No. 9, System Engineering
for Private Investment Facility Project Stage
1 |
| |
 |
Schedule: May 2005 ~ Jun. 2009 |
 |
Overview |
| |
 |
Length: 25.5Km |
 |
Design management |
 |
RAMS management |
 |
EMI/EMC management |
 |
Quality management |
 |
Safety management |
 |
Shunting yard design management
|
 |
Test and test operation management
|
|
| |
|
|
|
|
 |
Bridge |
| |
 |
Pailon-San Jose Highway Construction Project
|
 |
Schedule: Apr. 2004 ~ Aug. 2004 (Design)
Sep.
2005 ~ Nov. 2007 (Supervision) |
 |
Overview |
| |
 |
Bridge construction project carried
out with the funding from EDCF |
 |
(Economic Development Cooperation
Fund) provided by the Korean government
|
 |
Customer: Bureau of Road Construction,
Bolivia (SNC: Servicio Nacional de
Caminos) |
 |
Length: 1,400m (700m X 2ea) |
 |
Bridge Width: 11.0m |
 |
Construction Method: PSC Box bridge
by I.L.M method |
 |
Substructure: Hollow type R.C. Structure
|
 |
2-laned Access Road: 1,465m |
|
| |
|
|
|