    Major Achievements
 
 
 
The company that is putting ceaseless effort to lay more advanced foundation for human being is Byucksan Engineering


 
 
   
 
Road and airport
Railroad and urban train
Urban planning
Foundation and underground space
 
 
 
   

   
Road and airport
 
 
Airport Development in Sokcho Region
 
Scope : Basic research and design service
Purpose: To examine the appropriateness of airport construction for development of Gangwon region
(Yangyang) as well as to activate local development and freight transportation
Scale: Landing strip, annexed facilities and 1 set of plans for entrance road
Order Placement by: Ministry of Construction and Transportation
Schedule: Aug. 9, 1994 ~ Sep. 13, 1995
Design by: Byucksan ENG & Daewoo Engineering & Construction
   
Expressway Construction in Anjung - Eumseong (Anjung - Pyeongtaek)
 
Scope : Enforcement design (zone 3)
Purpose: To respond to the increased traffic in metropolitan areas, to promote roadside development and to improve efficiency of transportation support system by connecting West Coast Expressway and Gyeongbu Expressway with the East-West 4-lane route in the 3rd National Land Development Plan (9 X7)
Scale: L = 7.54km, B = 23.4m (4-lane)
11 bridges/ 1,315m and 1 underground road
1 flyover (trumpet-type, Songtan I.C)
Road Classification: Motorway, Designed Speed: 120km/hr
Order Placement by: Korea Highway Corporation
Schedule: Dec. 26, 1996 ~ Oct. 20, 1997
   
Bypass Construction (Susang -Sinseok) to Replace National Road in Andong-Si
 
Scope : Enforcement Design
Purpose: To construct a bypass to replace a national road in Andong-Si by building a road between Susang-Dong and Namseon-Myeon of Andong-Si, Gyeongsangbuk-Do to promote convenient and successful traffic flow
Scale: L = 8.0km, B = 20.0m (4-lane)
7 bridges/ 991m, 2 tunnels/ 991m
3 intersections (2 flyovers and 1 planar intersection)
Road Classification: Main artery in regional area, Designed Speed: 80km/hr
Order Placement by: Busan Regional Construction of Management Office
Schedule: Dec. 31, 1997 ~ Dec. 5, 1998
   
Road Construction in Sanghwaro - Myeonggok Building Site
 
Scope : Basic and enforcement design
Purpose: To resolve traffic congestion caused by building of large-scaled apartment complex as a part of Myeonggok building site development and to expand entrance road, thus to promote improvement in residential environment and balanced local development
Scale: L = 2,17km, B = 30.0m (6-lane)
Road Classification: Sub artery in urban area (highway category 2), Designed Speed: 60km/hr
Order Placement by: Daegu Metropolitan City
Schedule: Jun. 12, 2000 ~ May 12, 2002
   
Bypass Construction in Muju - Anseong
 
Scope : Enforcement design
Purpose: To resolve traffic congestion increasingly aggravated in Anseong-Myeon area of Muju-Gun in the route of National Road No. 19 (Namhae - Wonju) and to enable successful freight transportation from the area to the northeast of Jeollabuk-Do, thus to achieve promotion in local development and balanced development of the national territory
Scale: L=5.93km, B=20.0m (4-lane)
9 bridges/ 528m, 5 intersections (1 planar intersection and 4 flyovers)
Road Classification: Regional main artery (national road 3), Designed Speed: 80km/hr
Order Placement by: Iksan Regional Construction of Management Office
Schedule: Jul. 4, 2001 ~ Mar. 6, 2003